MBTA Red Line Delays between Park and Harvard Square.

In the last two weeks Red Line MBTA has been dreadful during evening hours between 5 and 6 pm home bound from work.  Since October  10th 2016 the Red Line has made long haul stops breaks between Park and Harvard stating that there is a problem with signals at Alewife station. This is an on-going …

MBTA Improvements

Two recent presentations by the MBTA show good progress towards future improvements: Red Line Capacity Constraints A recent comprehensive study of the Red Line indicated that a new vehicles, signal upgrades and operations improvements could result in major service improvements and an increase in system throughput, effectively increasing capacity. Automated Fare Collection 2.0 AFC 2.0 will be a completely …

Arsenal Street Corridor Study: Public Meeting

Please join the Massachusetts Department of Transportation for a Public Information Meeting on the Arsenal Street Corridor Study Tuesday, October 4, 2016 6:00 PM to 8:00 PM Watertown Middle School, Auditorium & Cafeteria 68 Waverley Ave, Watertown, MA The Massachusetts Department of Transportation (MassDOT) is studying the Arsenal Street Corridor in Watertown. This study will develop …

Back Bay Station Concourse Project: Public Meeting

MBTA PUBLIC MEETING Back Bay Station Concourse Project DATE:                 Monday, September 26, 2016 TIME:                  6:00 PM LOCATION:      Transportation Building 10 Park Plaza Conference Rooms 1, 2 and 3 Boston, MA  02116 MEETING AGENDA:         The MBTA’s Back Bay Station project team will present the 30% design for the forthcoming renovations of the Back Bay …

All Electronic Tolling

Over the last several months you may have noticed overhead electronic tolling gantries installed along the Massachusetts Turnpike.  On October 28th, 2016 those gantries will go live and begin collecting tolls.  Here are some things you should know about the transition to All Electronic Tolling (AET): Why: Safety: Crash rates are significantly higher around toll …