MBTA Designing Improvements to Green Line

This BNN News interview with Senator Brownsberger and Erik Stoothoff, Chief Engineer of MBTA Design and Construction, looks at the planned improvements to the Commonwealth Avenue Green Line proposed by the MBTA to consolidate four B branch stops: BU West, St. Paul, Babcock, and Pleasant, down to two new accessible stops to help reduce travel times and improve safety.

Comm Ave 10_27_14 BNNinterview

Please note, this thread is not open for comment at this time.

Looking for something you can’t find?

Please don’t hesitate to contact us directly for assistance!

Powered by open source software: LAMP, WordPress, Plugins include: Akismet, TablePress, Yet Another Related Posts Plugin. Graphic Design by Jane Winsor. Development of Responsive Tabs Theme by Will Brownsberger. Hosted by Inmotion Hosting. Hosting paid for by the Brownsberger Commitee.

Welcome!

WillBrownsberger.com is a conversation:

  • You can comment on any post this site.
  • You can post your own new subjects on this site.
  • You do not need a password.
  • I absolutely depend on your feedback.

You can subscribe at this link for occasional email news from this site

Will Brownsberger
State Senator
2d Suffolk and Middlesex District